Firm Profile

Civil Engineering

Surveying

Transportation Design

Make Contact

Careers


Logo.jpg (12488 bytes)

Brosnihan Square - "Gateway I" Reconstruction
Worcester, MA

Cullinan is performing traffic & transportation engineering, final design, and land surveying services for the reconstruction / streetscaping of this 1.8 mile "Gateway" to downtown, which is at the northerly terminus of the Route 146 Project. The project includes topographic, right-of-way, and property line surveys, traffic analysis, design of four signals and system interconnect, arterial lane additions, intersection improvements & synchronization, roadway realignment, land takings, easements, and design of drainage improvements to widen from two to four lanes. Cullinan is also preparing plans, specifications, and cost estimate (PS&E) for MHD, and is coordinating public meetings and client / abutter contact. Given the magnitude of this project, Cullinan was involved with neighborhood groups, businesses, and state agencies to resolve transportation planning issues and large land taking issues. This project was funded by MHD.

Back to Top

Back to Transportation Design Page

Home  |  Firm Profile   |  Civil Engineering  |  Surveying
Transportation Design   |  Make Contact  |  Careers