Firm Profile

Civil Engineering

Surveying

Transportation Design

Make Contact

Careers


Logo.jpg (12488 bytes)

T.F. Green Airport
Warwick, RI

Cullinan performed aerial mapping control by a GPS system to facilitate the total mapping at the airport. Cullinan established 80 photo control points, four of which will serve as permanent control positions for future use by the Rhode Island Airport Corporation. Cullinan completed the GPS planning, measurements, and data processing tasks using dual frequency Ashtech Z-Surveyor GPS hardware and corresponding software.

Back to
Surveying Page

Home  |  Firm Profile   |  Civil Engineering  |  Surveying
Transportation Design   |  Make Contact  |  Careers